Our floating solar demonstration project is moving forward. The 1MW PV-bos project in Valencia harbour is reaching its first milestones.

📝 👩🏼‍💻 The design optimization for Valencia sea conditions is finished. The main outcome is a remarkable steel weight reduction. LCOE reduction targets are on the right path to be achieved.

🚀🧨 The detail design stage was initiated. Hundreds of advanced simulations, drawings and design reports will be performed along next 5 months.

📑👷 First round of contacts with main suppliers was successfully finished. The supply chain is eager to participate on this new technology and energy sector. No supply bottlenecks are expected.

⚓️🏭 Valencia harbour authorities are actively supporting our project as part of their decarbonisation policies. Thanks Raul Cascajo and Fundación Valenciaport for your tireless work.

🔨👷🏻‍♂️⚙️ Construction is planned to be initiated by the end of Q2 2024.

🏆🥇 BlueNewables’ proprietary technology PV-bos will demonstrate its reliability for two years in Valencia´s waters, becoming a frontrunner in the offshore # floating solar race.
Thanks to IDAE. Instituto para la Diversificación y Ahorro de la Energía for your support as part of the RENMARINAS program.