Skip to main content

Owners engineering

  • Design review covering from conceptual to detail phases:
    • Revision engineering
      approach and planning
    • Mooring
    • Structural design
    • Stability
    • Motions
    • Installations strategies
    • Ballast systems
  • Supervision of engineering contractors
  • Liaison with certification bodies and accompaniment along the process

Other services.

Consultancy

Project management

Offshore engineering and design

Floating wind and floating solar farms development

Secondment

BN blog

News
27 de diciembre de 2024

The project PV-bos GROW has been awarded with a KSSP 2024 (Korea Spain Strategic Programme) grant

The project PV-bos GROW has been awarded with a KSSP 2024 (Korea Spain Strategic Programme) grant, a R&D Programme co-funded by the Spanish Centre for Technological Development and Innovation (CDTI)…
News
18 de enero de 2024

1MW PV-bos Hits Milestones in Valencia: Design Optimized, Suppliers on Board, Construction Set for 2024

Our floating solar demonstration project is moving forward. The 1MW PV-bos project in Valencia harbour is reaching its first milestones. 📝 👩🏼‍💻 The design optimization for Valencia sea conditions is finished. The main outcome is…
News
8 de noviembre de 2023

BlueNewables was awarded with RENMARINAS

IDAE. Instituto para la Diversificación y Ahorro de la Energía is presenting today on 2nd Offshore Wind Conference in the Canary Islands, the results of the R&D program RENMARINAS DEMOS ,…